Feasibility of gamma emission tomography for partial defect verification of spent LWR fuel assemblies : Summary report on simulation and experimental studies including design options and cost-benefit analysis : Task JNT A1201 of the Support Programmes of Finland (FINSP), Hungary (HUNSP) and Sweden (SWESP) to the IAEA Safeguards
Lévai F; Desi S; Czifrus S; Feher S; Tarvainen M; Honkamaa T; Saarinen J; Larsson M; Rialhe A; Arlt R (2002-11-12)
Lévai F
Desi S
Czifrus S
Feher S
Tarvainen M
Honkamaa T
Saarinen J
Larsson M
Rialhe A
Arlt R
Säteilyturvakeskus
12.11.2002
Summary report on simulation and experimental studies including design options and cost-benefit analysis. Task JNT A1201 of the Support Programmes of Finland (FINSP), Hungary (HUNSP) and Sweden (SWESP) to the IAEA Safeguards.
Julkaisun pysyvä osoite on
https://urn.fi/URN:NBN:fi-fe2014120248701
STUK-YTO-TR : 189
https://urn.fi/URN:NBN:fi-fe2014120248701
STUK-YTO-TR : 189
Kokoelmat
- STUKin omat sarjajulkaisut [2304]